GELD Solar Farm
Middlesex County, Massachusetts · EIA plant ID 61539 · Operator: Ameresco, Inc - GELD
Nameplate2MWSummer 2 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor16%solar units, summer MW
Heat rate—thermal plants only
First online2016
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2017 | 3.5 | 17.2% | — |
| 2018 | 3.4 | 16.9% | — |
| 2019 | 3.5 | 17.4% | — |
| 2020 | 3.6 | 18.0% | — |
| 2021 | 3.5 | 17.4% | — |
| 2022 | 3.3 | 16.3% | — |
| 2023 | 3.5 | 17.3% | — |
| 2024 | 3.5 | 17.2% | — |
| 2025 | 3.3 | 16.3% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GELD | Solar Photovoltaic | PV | 2.3 | 2.3 | Jun 2016 | Operating | — | coming soon |
Owner / operator
Operator: Ameresco, Inc - GELD. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Ameresco, Inc - GELD | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| Ashland Solar | 5 MW | 2 km |
| Centaurus Solar - MA | 2 MW | 6.2 km |
| Framingham State University Plant | 3 MW | 6.6 km |
| Hopkinton CSG | 2 MW | 7 km |
| Exelon Framingham LLC | 43 MW | 8.4 km |
| Westborough Solar LLC | 2 MW | 9 km |