Braintree Landfill Solar

Norfolk County, Massachusetts · EIA plant ID 61538 · Operator: Ameresco, Inc - Braintree
SolarSolar PhotovoltaicISONEBA: ISNE
Nameplate1MWSummer 1 MW
Generators1in service
Net generation1GWh12 mo to Dec 2025
Capacity factor15%solar units, summer MW
Heat rate—thermal plants only
First online2014

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
050100150200MWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%2018202020222024202614.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20171.415.8%—
20181.517.6%—
20191.618.2%—
20201.618.1%—
20211.618.2%—
20221.618.1%—
20231.213.2%—
20241.213.8%—
20251.314.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BRAINSolar PhotovoltaicPV11Dec 2014Operating—coming soon

Owner / operator

Operator: Ameresco, Inc - Braintree. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Ameresco, Inc - Braintree100.0%1 MW

Nearby plants

Within 80 km.
Station 9 Energy Storage System2 MW2.8 km
Potter Station 2116 MW4 km
Fore River Generating Station872 MW4.7 km
Randolph4 MW7.3 km
Boston Scientific Solar1 MW10 km
Dorchester Solar Site1 MW11.2 km