← Back to map

Wyoming 2 CSG, LLC

Chisago County, Minnesota · EIA plant ID 61486 · Operator: Ecoplexus, Inc
SolarSolar PhotovoltaicMISOBA: MISO
Nameplate5MWSummer 5 MW
Generators5in service
Net generation8GWh12 mo to Dec 2025
Capacity factor17%solar units, summer MW
Heat rate—thermal plants only
First online2018

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh2019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%20182019202020212022202320242025202617.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20185.314.5%—
20197.116.1%—
20208.519.3%—
20218.419.1%—
20227.817.9%—
20237.817.9%—
20248.218.6%—
20257.517.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WY01Solar PhotovoltaicPV11Mar 2018Operating—coming soon
WY02Solar PhotovoltaicPV11Mar 2018Operating—coming soon
WY03Solar PhotovoltaicPV11Mar 2018Operating—coming soon
WY04Solar PhotovoltaicPV11Mar 2018Operating—coming soon
WY05Solar PhotovoltaicPV11Mar 2018Operating—coming soon

Owner / operator

Operator: Ecoplexus, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Ecoplexus, Inc100.0%5 MW

Nearby plants

Within 80 km.
USS Cheyenne Solar LLC CSG1 MW2.2 km
MSC-Scandia01 CSG1 MW8.5 km
USS Good Solar CSG1 MW9.6 km
USS Rockpoint Solar CSG1 MW10.2 km
Nautilus Lindstrom Solar (CSG)2 MW10.7 km
Forest Lake Solar CSG5 MW11.6 km