Panasonic Carport Solar Hybrid
Adams County, Colorado · EIA plant ID 61439 · Operator: Public Service Co of Colorado
×1 MW battery retired since 2020 (latest Sep 2022)
Nameplate1MWSummer 1 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor16%solar units, summer MW
Heat rate—thermal plants only
First online2017
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2017 | 1.3 | 20.5% | — |
| 2018 | 2.2 | 19.6% | — |
| 2019 | 1.3 | 19.2% | — |
| 2020 | 2.3 | 19.0% | — |
| 2022 | 1.8 | 15.9% | — |
| 2023 | 2.2 | 19.5% | — |
| 2024 | 2.2 | 19.2% | — |
| 2025 | 1.8 | 16.1% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| PANPV | Solar Photovoltaic | PV | 1.3 | 1.3 | May 2017 | Operating | — | coming soon |
| PANBS | Batteries | BA | 1 | 1 | Aug 2017 | Retired Sep 2022 | — | coming soon |
Owner / operator
Operator: Public Service Co of Colorado. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Public Service Co of Colorado | 100.0% | 1 MW |
Nearby plants
Within 80 km.
| Gaylord Rockies CHP | 4 MW | 3 km |
| Amazon DEN2 Solar Project | 1 MW | 7.1 km |
| Denver Int Airport | 2 MW | 7.9 km |
| Pivot Solar 10 | 2 MW | 8.9 km |
| Pivot Solar 21 | 5 MW | 9 km |
| Pivot Solar 9 | 2 MW | 9.1 km |