← Back to map

Red Pine Wind Project

Lincoln County, Minnesota · EIA plant ID 61357 · Operator: EDF Renewable Asset Holdings, Inc.
WindOnshore Wind TurbineMISOBA: MISO
Nameplate200MWSummer 200 MW
Generators1in service
Net generation784GWh12 mo to Aug 2026
Capacity factor45%wind units, summer MW
Heat rate—thermal plants only
First online2017

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
020406080GWh201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2018202020222024202644.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2017110.574.3%—
2018798.145.6%—
2019780.544.5%—
2020850.548.4%—
2021724.341.3%—
2022724.941.4%—
2023609.934.8%—
202470440.1%—
2025773.644.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
RP1Onshore Wind TurbineWT200200Dec 2017Operating—vestas V110-2.0

Owner / operator

Operator: EDF Renewable Asset Holdings, Inc.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
EDF Renewable Asset Holdings, Inc.100.0%200 MW

Nearby plants

Within 80 km.
Buffalo Ridge Wind106 MW12.9 km
Blazing Star 2 Wind Farm200 MW16.2 km
Blazing Star Wind Farm 1200 MW18.5 km
Jessica Mills LLC2 MW22.6 km
Lincoln Heights II4 MW22.9 km
Sun River LLC2 MW23 km