MDFA Devens-Saratoga

Worcester County, Massachusetts · EIA plant ID 61350 · Operator: Terraform Arcadia
SolarSolar PhotovoltaicISONEBA: ISNE
Nameplate3MWSummer 3 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor15%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%20162018202020222024202614.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201600.0%—
20172.310.6%—
20183.415.5%—
20193.415.5%—
20203.716.9%—
20213.515.8%—
20223.716.9%—
20233.515.8%—
20243.515.8%—
20253.314.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SO145Solar PhotovoltaicPV2.52.5Mar 2016Operating—coming soon

Owner / operator

Operator: Terraform Arcadia. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Terraform Arcadia100.0%3 MW

Nearby plants

Within 80 km.
GSPP Devens, LLC2 MW1.1 km
Shirley Water2 MW2.3 km
Devens3 MW2.8 km
EBZ Solar3 MW3.6 km
EDF Lancaster5 MW5.7 km
Shirley Landfill1 MW6.4 km