Green Meadow Solar, LLC

Lewis and Clark County, Montana · EIA plant ID 61291 · Operator: Enerparc Inc.
SolarSolar PhotovoltaicBA: NWMT
Nameplate3MWSummer 3 MW
Generators1in service
Net generation5GWh12 mo to Aug 2026
Capacity factor17%solar units, summer MW
Heat rate—thermal plants only
First online2017

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2018202020222024202617.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20174.321.9%—
20186.223.4%—
20195.219.8%—
20205.219.8%—
20215.822.2%—
20225.521.1%—
20235.520.8%—
20245.621.3%—
20255.520.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GMSMTSolar PhotovoltaicPV33Apr 2017Operating—coming soon

Owner / operator

Operator: Enerparc Inc.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Enerparc Inc.100.0%3 MW

Nearby plants

Within 80 km.
Hauser17 MW15.6 km
Great Divide Solar, LLC3 MW18.8 km
Canyon Ferry58 MW26.1 km
Holter55 MW33.3 km