APG Combined Heat and Power Plant

Harford County, Maryland · EIA plant ID 61282 · Operator: US Dept of Army, Garrison, APG
Natural gasNatural Gas Fired Combustion TurbinePJMBA: PJM
Nameplate8MWSummer 6 MW
Generators1in service
Net generation47GWh12 mo to Dec 2025
Capacity factor87%gas/coal/oil units, summer MW
Heat rate12,171Btu/kWhfossil units, electric fuel, HHV
First online2016Runs as baseload

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%100%200%300%20162018202020222024202686.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
11,00011,50012,00012,50013,00020162018202020222024202612,171 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201616.1349.3%12,643
201750.593.0%12,162
201856.7104.3%11,844
201955.3101.8%11,966
202035.364.8%11,435
20210.10.1%11,392
20220.10.1%11,393
202349.791.5%12,929
20245397.3%12,875
202547.186.8%12,171

Fuel capability

Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusListed in EIA-860, no liquid burn in 36 months
Liquid fuel burned · 36 mo0 MMBtu
Last month with liquid burn—
Switch while operating—
Net summer MW on gas—
Net summer MW on oil—
Time gas → oil—
Time oil → gas—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Natural Gas Fired Combustion TurbineGT7.96.2Dec 2016Operating—coming soon

Owner / operator

Operator: US Dept of Army, Garrison, APG. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
US Dept of Army, Garrison, APG100.0%8 MW

Nearby plants

Within 80 km.
Macy's MD Joppa Solar Project2 MW5.9 km
Eastern Landfill Gas LLC4 MW8 km
Havre de Grace II - E at Perryman1 MW8 km
Baltimore City G2 MW8 km
Baltimore City B2 MW8 km
City of Havre De Grace C2 MW8 km