← Back to map

Kayenta Solar Project

Navajo County, Arizona · EIA plant ID 61268 · Operator: NGI-Kayenta Solar Lessor I, LLC
SolarSolar PhotovoltaicBA: WALC
Nameplate55MWSummer 55 MW
Generators2in service
Net generation119GWh12 mo to Aug 2026
Capacity factor25%solar units, summer MW
Heat rate—thermal plants only
First online2017

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0510GWh201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2018202020222024202624.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201751.231.9%—
201874.631.2%—
20197923.1%—
2020128.726.5%—
2021125.525.9%—
202210621.9%—
2023102.321.1%—
202487.518.0%—
202512125.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV27.327.3May 2017Operating—coming soon
PV2Solar PhotovoltaicPV2828Aug 2019Operating—coming soon

Owner / operator

Operator: NGI-Kayenta Solar Lessor I, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
NGI-Kayenta Solar Lessor I, LLC100.0%55 MW

Nearby plants

Within 80 km.
No other plants within 80 km.