Gale 1 SolarPlanned
Millard County, Utah · EIA plant ID 61170 · Operator: 33UI 8me LLC
450 MW planned (Batteries, Solar Photovoltaic), first expected Aug 2030 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 33UI8 | Solar Photovoltaic | PV | 300 | 300 | planned Aug 2030 | Planned | — | coming soon |
| 33UI9 | Batteries | BA | 150 | 150 | planned Aug 2030 | Planned | — | coming soon |
Owner / operator
Operator: 33UI 8me LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Intermountain Power Project | 1,093 MW | 3.3 km |
| Utah Solar 1 | — | 3.9 km |
| Notch Peak Solar LLC | — | 9.8 km |
| Intermountain Pumped Storage Project | — | 15.1 km |
| Pavant Solar II LLC | 50 MW | 43.7 km |
| Pavant Solar III | 20 MW | 44 km |