← Back to map

Gale 1 SolarPlanned

Millard County, Utah · EIA plant ID 61170 · Operator: 33UI 8me LLC
SolarBA: LDWP

450 MW planned (Batteries, Solar Photovoltaic), first expected Aug 2030 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
33UI8Solar PhotovoltaicPV300300planned Aug 2030Planned—coming soon
33UI9BatteriesBA150150planned Aug 2030Planned—coming soon

Owner / operator

Operator: 33UI 8me LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Intermountain Power Project1,093 MW3.3 km
Utah Solar 1—3.9 km
Notch Peak Solar LLC—9.8 km
Intermountain Pumped Storage Project—15.1 km
Pavant Solar II LLC50 MW43.7 km
Pavant Solar III20 MW44 km