Aratina Solar Center 1 Hybrid

San Bernardino County, California · EIA plant ID 61167 · Operator: 91MC 8me LLC
SolarBatteriesSolar PhotovoltaicCAISOBA: CISO
Nameplate130MWSummer 130 MW
Generators2in service
Net generation28GWh12 mo to Aug 2026
Capacity factor24%solar units, summer MW
Heat rate—thermal plants only
First online2026

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
05101520GWh

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2026202723.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
91MC8Solar PhotovoltaicPV8080Jul 2026Operating—coming soon
BESSBatteriesBA5050Jul 2026Operating—coming soon

Owner / operator

Operator: 91MC 8me LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
91MC 8me LLC100.0%130 MW

Nearby plants

Within 80 km.
Aratina Solar Center 1A195 MW0 km
SEGS IIIretired2.6 km
SEGS VIIretired3 km
SEGS IVretired3.1 km
Resurgence Solar165 MW3.2 km
Resurgence Solar II88 MW3.2 km