Humacao Solar Project, LLC
Humacao County, Puerto Rico · EIA plant ID 61133 · Operator: Fonroche Energy America, Inc.
20 MW under construction (Solar Photovoltaic), first expected Mar 2027 · EIA-860M
Nameplate20MWSummer 20 MW
Generators1in service · 20 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online2016
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| HUM01 | Solar Photovoltaic | PV | 20 | 20 | Dec 2016 | Operating | — | coming soon |
| SSO01 | Solar Photovoltaic | PV | 20 | 20 | planned Mar 2027 | Under construction | — | coming soon |
Owner / operator
Operator: Fonroche Energy America, Inc.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Fonroche Energy America, Inc. | 100.0% | 20 MW |
Nearby plants
Within 80 km.
| HIMA San Pablo Humacao | 2 MW | 1.9 km |
| Yabucoa | 42 MW | 10.7 km |
| Medtronic Solar | 4 MW | 14.7 km |
| Punta Lima Wind Farm | 26 MW | 14.8 km |
| Rio Blanco | 5 MW | 15.1 km |
| Janssen Ortho LLC | 19 MW | 18.1 km |