Montefiore - Westchester Square
Bronx County, New York · EIA plant ID 61025 · Operator: Montefiore-Westchester Square
Nameplate1MWSummer 1 MW
Generators1in service
Net generation0GWh12 mo to Dec 2025
Capacity factor0%gas/coal/oil units, summer MW
Heat rate8,615Btu/kWhfossil units, electric fuel, HHV
First online1983Runs as rarely runs
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2016 | 0 | 0.0% | — |
| 2017 | 0 | 0.0% | — |
| 2018 | 0 | 0.0% | — |
| 2019 | 0 | 0.1% | 6,429 |
| 2020 | 0 | 0.0% | — |
| 2021 | 0 | 0.0% | — |
| 2022 | 0 | 0.0% | 25,500 |
| 2023 | 0 | 0.0% | 18,333 |
| 2024 | 0 | 0.1% | 6,556 |
| 2025 | 0 | 0.1% | 8,615 |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| EGEN1 | Petroleum Liquids | IC | 1 | 1 | Jul 1983 | Operating (Standby / backup) | — | coming soon |
Owner / operator
Operator: Montefiore-Westchester Square. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Montefiore-Westchester Square | 100.0% | 1 MW |
Nearby plants
Within 80 km.
| Albert Einstein College of Medicine | 8 MW | 1.2 km |
| Jacobi Medical Center | 9 MW | 1.8 km |
| Bronx Zoo | 4 MW | 2.4 km |
| Gunther | 3 MW | 2.9 km |
| Warbler Clean Energy LLC | — | 3 km |
| Piping Plover Clean Energy, LLC | — | 3 km |