St. Charles County, Louisiana · EIA plant ID 60926 · Operator: Entergy Louisiana LLC
Natural gasNatural Gas Fired Combined CycleMISOBA: MISO
Nameplate1,000MWSummer 1,000 MW
Generators3in service
Net generation4,742GWh12 mo to Aug 2026
Capacity factor59%gas/coal/oil units, summer MW
Heat rate7,007Btu/kWhfossil units, electric fuel, HHV
First online2019Runs as baseload

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600GWh2020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%20192020202120222023202420252026202758.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,6006,8007,0007,2002019202020212022202320242025202620277,007 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20193,615.761.5%6,945
20205,850.666.6%6,923
20215,011.357.2%6,821
20225,537.663.2%7,144
20235,059.557.8%6,857
20245,206.759.3%6,964
20255,539.963.2%7,244

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1ANatural Gas Fired Combined CycleCT250250May 2019Operating—coming soon
1BNatural Gas Fired Combined CycleCT250250May 2019Operating—coming soon
1CNatural Gas Fired Combined CycleCA500500May 2019Operating—coming soon

Owner / operator

Operator: Entergy Louisiana LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Entergy Louisiana LLC100.0%1,000 MW

Nearby plants

Within 80 km.
Little Gypsy1,003 MW0.6 km
Waterford 31,200 MW1.9 km
Waterford 1 & 2487 MW2 km
Taft Cogeneration Facility894 MW2.4 km
Dow St Charles Operations324 MW3.3 km
Waterford 5—3.4 km