← Back to map

Spirit Mound

Clay County, South Dakota · EIA plant ID 6092 · Operator: Basin Electric Power Coop
OilPetroleum LiquidsSPPBA: SWPP
Nameplate135MWSummer 95 MW
Generators2in service
Net generation3GWh12 mo to Aug 2026
Capacity factor0%gas/coal/oil units, summer MW
Heat rate16,034Btu/kWhfossil units, electric fuel, HHV
First online1978Runs as rarely runs

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02468GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%1%1%200520102015202020250.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
10,00015,00020,00025,0002005201020152020202516,034 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20013.10.4%14,074
20021.20.1%15,075
20032.30.3%14,554
20042.90.3%13,210
20050.20.0%14,884
20060.40.1%14,023
20076.80.8%12,812
200830.4%12,922
20090.30.0%16,076
20100.20.0%15,206
20111.20.1%13,919
20121.40.2%14,475
201310.1%14,173
20141.60.2%13,154
20150.20.0%26,816
20160.80.1%14,955
20170.30.0%20,312
20180.80.1%15,217
20195.40.7%13,823
202020.2%15,247
202110.61.3%12,816
20226.80.8%14,773
20238.81.1%13,521
20244.70.6%—
20252.40.3%16,322

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Petroleum LiquidsGT67.550Jun 1978Operating—coming soon
2Petroleum LiquidsGT67.545Jun 1978Operating—coming soon

Owner / operator

Operator: Basin Electric Power Coop. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Basin Electric Power Coop100.0%135 MW

Nearby plants

Within 80 km.
Yankton13 MW29.6 km
Gavins Point132 MW40.4 km
Prevailing Wind Park220 MW46.3 km
POET Biorefining - Hudson4 MW47.3 km
Laurel4 MW52.6 km
POET Biorefining - Chancellor5 MW52.6 km