Oliver Wind III, LLC

Morton County, North Dakota · EIA plant ID 60905 · Operator: Oliver Wind III, LLC
WindOnshore Wind TurbineMISOBA: MISO
Nameplate99MWSummer 99 MW
Generators1in service
Net generation383GWh12 mo to Aug 2026
Capacity factor44%wind units, summer MW
Heat rate—thermal plants only
First online2017

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02040GWh2017201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2018202020222024202644.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2017444.251.1%—
2018425.748.9%—
2019429.949.4%—
2020457.152.4%—
2021404.446.5%—
2022459.752.8%—
2023412.147.4%—
2024416.947.8%—
2025380.143.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WT1Onshore Wind TurbineWT99.399.3Jan 2017Operating—ge 2.0-116

Owner / operator

Operator: Oliver Wind III, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Oliver Wind III, LLC100.0%99 MW

Nearby plants

Within 80 km.
Milton R Young734 MW12.6 km
FPL Energy Oliver Wind I LLC51 MW21.9 km
FPL Energy Oliver Wind II LLC48 MW21.9 km
R M Heskett178 MW23.8 km
Tesoro Mandan Cogeneration Plant9 MW24.9 km
Red Butte Wind—26.1 km