Prudential 80 Livingston Roseland Solar

Essex County, New Jersey · EIA plant ID 60842 · Operator: prudential drive investors, llc
SolarSolar PhotovoltaicPJMBA: PJM
Nameplate2MWSummer 2 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor17%solar units, summer MW
Heat rate—thermal plants only
First online2013

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300MWh2016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202617.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20162.818.7%—
2017320.0%—
20182.818.6%—
20192.919.5%—
20202.818.7%—
20210.53.6%—
20222.718.3%—
202300.0%—
20242.617.6%—
20252.517.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV1.71.7Dec 2013Operating—coming soon

Owner / operator

Operator: prudential drive investors, llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
prudential drive investors, llc100.0%2 MW

Nearby plants

Within 80 km.
ADP Roseland, NJ2 MW0.4 km
Prudential 55 Livingston Roseland Solar1 MW0.7 km
Caldwell Wastewater Treatment Plant Hybrid2 MW2.7 km
CCG Marketing2 MW4.9 km
East Orange Solar5 MW8 km
Canoe Brook Solar6 MW8.5 km