← Back to map

Webster Holdco Solar CSG

Rice County, Minnesota · EIA plant ID 60830 · Operator: Webster Holdco LLC
SolarSolar PhotovoltaicMISOBA: MISO
Nameplate5MWSummer 5 MW
Generators1in service
Net generation8GWh12 mo to Dec 2025
Capacity factor18%solar units, summer MW
Heat rate—thermal plants only
First online2017

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh20182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2018202020222024202617.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20173.917.6%—
20187.417.0%—
20197.116.1%—
20207.617.3%—
20218.719.9%—
20227.717.6%—
2023818.2%—
20247.416.8%—
20257.817.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WEBSTSolar PhotovoltaicPV55Jul 2017Operating—coming soon

Owner / operator

Operator: Webster Holdco LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Webster Holdco LLC100.0%5 MW

Nearby plants

Within 80 km.
USS Webster Solar CSG1 MW1.2 km
Veseli Community Solar Garden1 MW3.5 km
Schultz CSG2 MW4.1 km
USS Centerfield Solar CSG1 MW5 km
New Prague17 MW13 km
Chub Garden Solar1 MW16.4 km