← Back to map

Valley Sanitary District WTP Solar

Riverside County, California · EIA plant ID 60824 · Operator: SolarCity Corporation
SolarSolar PhotovoltaicBA: LDWP
Nameplate1MWSummer 1 MW
Generators1in service
Net generation0GWh12 mo to Dec 2025
Capacity factor3%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
050100150200MWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2016201820202022202420263.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201600.0%—
20171.415.4%—
20181.921.4%—
20191.921.3%—
20201.617.9%—
20211.618.5%—
20221.718.9%—
20231.517.5%—
20241.415.8%—
20250.33.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV11Dec 2016Operating—coming soon

Owner / operator

Operator: SolarCity Corporation. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
SolarCity Corporation100.0%1 MW

Nearby plants

Within 80 km.
Coachella92 MW4.5 km
Desert View Powerretired17.1 km
Colgreen North Shore Solar Farm75 MW28 km
Wildcat I Energy Storage LLC3 MW29.1 km
Carris Storage I10 MW29.4 km
Hecate Energy Desert Storage 1 LLC10 MW29.4 km