Goodhue County, Minnesota · EIA plant ID 60796 · Operator: Terraform Arcadia
SolarSolar PhotovoltaicMISOBA: MISO
Nameplate5MWSummer 5 MW
Generators1in service
Net generation7GWh12 mo to Dec 2025
Capacity factor17%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.511.5GWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202617.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20160.11.9%—
20177.317.1%—
20187.317.1%—
20196.715.6%—
20207.417.2%—
20218.720.3%—
20228.119.0%—
20237.317.0%—
20247.818.1%—
20257.417.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SO234Solar PhotovoltaicPV4.94.9Dec 2016Operating—coming soon

Owner / operator

Operator: Terraform Arcadia. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Terraform Arcadia100.0%5 MW

Nearby plants

Within 80 km.
Novel Stumpf 1 Solar CSG1 MW2 km
Red Wing23 MW3.8 km
Foreman's Hill Community Solar5 MW9.8 km
Trimbelle (Pierce Pepin)2 MW11.1 km
Lady Slipper Solar Array CSG5 MW11.7 km
Frontenac Holdco LLC, CSG5 MW13 km