← Back to map

Raritan Solar

Hunterdon County, New Jersey · EIA plant ID 60729 · Operator: GSRP
SolarSolar PhotovoltaicPJMBA: PJM
Nameplate8MWSummer 8 MW
Generators1in service
Net generation11GWh12 mo to Aug 2026
Capacity factor17%solar units, summer MW
Heat rate—thermal plants only
First online2016

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.511.5GWh2017201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%20162018202020222024202617.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20169.118.5%—
201712.619.2%—
20188.613.3%—
201912.619.1%—
202012.519.0%—
202112.118.5%—
202212.519.1%—
202312.218.6%—
202411.817.9%—
202511.517.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV7.57.5Apr 2016Operating—coming soon

Owner / operator

Operator: GSRP. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
GSRP Project Holdings I LLC100.0%8 MW

Nearby plants

Within 80 km.
Raritan Solar - 53 Highway8 MW1.2 km
Flemington Solar8 MW2.2 km
East Amwell2 MW2.8 km
Junction Road4 MW6.7 km
Justin Court Energy Storage20 MW7 km
Quakertown Solar Farm II9 MW9.4 km