← Back to map

Waynesville Solar Farm (MO)

Pulaski County, Missouri · EIA plant ID 60706 · Operator: Missouri Jnt Muni.Pwr Elec. Ut. Comm.
SolarSolar PhotovoltaicSPPBA: SWPP
Nameplate3MWSummer 3 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor17%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600MWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%20162018202020222024202617.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20161.918.5%—
20174.719.4%—
20184.417.8%—
20194.317.6%—
20204.217.2%—
20214.217.0%—
20224.317.6%—
20234.618.7%—
20244.518.4%—
20254.217.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WSF1Solar PhotovoltaicPV2.82.8Aug 2016Operating—coming soon

Owner / operator

Operator: Missouri Jnt Muni.Pwr Elec. Ut. Comm.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
MPUA100.0%3 MW

Nearby plants

Within 80 km.
Lebanon Solar Farm (MO)3 MW39.7 km
Rolla Solar Farm (MO)3 MW51.2 km
Niangua3 MW54.3 km
Osage Dam208 MW55.1 km
Vichy Solar—55.2 km
Black Oak Power Producers4 MW66 km