Nameplate250MWSummer 250 MW
Generators1in service
Net generation949GWh12 mo to Aug 2026
Capacity factor43%wind units, summer MW
Heat rate—thermal plants only
First online2016
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2016 | 69.5 | 37.4% | — |
| 2017 | 1,017.8 | 46.5% | — |
| 2018 | 972.9 | 44.4% | — |
| 2019 | 983.3 | 44.9% | — |
| 2020 | 953.7 | 43.5% | — |
| 2021 | 961.8 | 43.9% | — |
| 2022 | 1,013.1 | 46.3% | — |
| 2023 | 921 | 42.1% | — |
| 2024 | 929.8 | 42.4% | — |
| 2025 | 902.2 | 41.2% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| WT1 | Onshore Wind Turbine | WT | 249.9 | 249.9 | Dec 2016 | Operating | — | ge 2.0-116 |
Owner / operator
Operator: Rush Springs Wind Project. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Rush Springs Wind Project | 100.0% | 250 MW |
Nearby plants
Within 80 km.
| Rush Springs Energy Storage (BA) | 10 MW | 1.4 km |
| Drift Sand Wind Project LLC | 108 MW | 19.9 km |
| Rush Springs Solar | — | 24.5 km |
| Cyril | 5 MW | 43.6 km |
| White Rock East Wind Project | 202 MW | 45.9 km |
| Comanche (OK) | 294 MW | 47.9 km |