GMP Solar - Richmond

Chittenden County, Vermont · EIA plant ID 60547 · Operator: Green Mountain Power Corp
SolarSolar PhotovoltaicISONEBA: ISNE
Nameplate2MWSummer 2 MW
Generators1in service
Net generation3GWh12 mo to Aug 2026
Capacity factor16%solar units, summer MW
Heat rate—thermal plants only
First online2016

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh2017201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%20162018202020222024202616.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20160.614.8%—
20172.816.7%—
20182.716.5%—
20192.917.3%—
2020317.8%—
20212.816.9%—
20222.917.5%—
20232.816.7%—
20242.917.1%—
20252.716.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV1.91.9Oct 2016Operating—coming soon

Owner / operator

Operator: Green Mountain Power Corp. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
GMP VT Solar LLC100.0%2 MW

Nearby plants

Within 80 km.
Jericho Landfill Solar Farm2 MW3.4 km
Jericho Gravel Solar Farm2 MW7 km
VEC Magee Hill Solar1 MW7.7 km
GMP Solar/Storage-Milton Hybrid7 MW8.4 km
GMP Solar - Williston5 MW8.7 km
Hinesburg2 MW8.8 km