← Back to map

Pine Island Solar

Goodhue County, Minnesota · EIA plant ID 60531 · Operator: Enel Green Power NA, Inc.
SolarSolar PhotovoltaicMISOBA: MISO
Nameplate4MWSummer 4 MW
Generators1in service
Net generation8GWh12 mo to Dec 2025
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202622.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201600.0%—
20176.217.8%—
20189.226.4%—
20196.719.1%—
20207.822.2%—
20217.922.6%—
20227.621.6%—
20238.424.1%—
20248.323.7%—
20257.722.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV44Dec 2016Operating—coming soon

Owner / operator

Operator: Enel Green Power NA, Inc.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Waseca Solar, LLC100.0%4 MW

Nearby plants

Within 80 km.
Pine Island Solar CSG4 MW1.7 km
USS Greenhouse Solar LLC CSG1 MW3.6 km
Huneke CSG 2, LLC1 MW6.3 km
Novel Huneke Solar LLC CSG1 MW6.7 km
T Luhman CSG1 MW8.5 km
FastSun 9 CSG1 MW10.2 km