← Back to map

Seminole

Seminole County, Georgia · EIA plant ID 60514 · Operator: Terraform Arcadia
SolarSolar PhotovoltaicBA: SOCO
Nameplate2MWSummer 2 MW
Generators1in service
Net generation1GWh12 mo to Dec 2025
Capacity factor9%solar units, summer MW
Heat rate—thermal plants only
First online2014

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh2016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2016201820202022202420268.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20163.122.0%—
2017321.2%—
20182.618.8%—
20191.39.1%—
20201.39.5%—
20211.39.3%—
20221.49.8%—
20231.410.2%—
20241.28.6%—
20251.28.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV1.61.6Oct 2014Operating—coming soon

Owner / operator

Operator: Terraform Arcadia. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Terraform Arcadia100.0%2 MW

Nearby plants

Within 80 km.
Georgia Power at Jakin GA PV2 MW12.5 km
Georgia-Pacific Cedar Springsretired19.2 km
Joseph M Farley1,776 MW24.5 km
SR Cedar Springs, LLC70 MW24.9 km
Decatur Parkway Solar Project, LLC80 MW29.5 km
Bainbridge Solar1 MW31.1 km