← Back to map

CPS 1 Community Solar

Bexar County, Texas · EIA plant ID 60472 · Operator: City of San Antonio - (TX)
SolarSolar PhotovoltaicERCOTBA: ERCO
Nameplate1MWSummer 1 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor20%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300MWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20162018202020222024202619.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20160.718.6%—
20172.123.8%—
20181.820.7%—
2019222.5%—
2020333.7%—
20211.820.4%—
20222.123.8%—
20231.820.5%—
20241.820.0%—
20251.719.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CPS1Solar PhotovoltaicPV11Aug 2016Operating—coming soon

Owner / operator

Operator: City of San Antonio - (TX). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
City of San Antonio - (TX)100.0%1 MW

Nearby plants

Within 80 km.
Bexar Corrilla BESS10 MW4.6 km
Alamo City ESS—6.1 km
Padua 150 MW8 km
Padua 2150 MW8 km
Padua 3—8 km
Rush ESS—8.3 km