Beech Ridge Energy Storage
Greenbrier County, West Virginia · EIA plant ID 60390 · Operator: Invenergy Services LLC
Nameplate32MWSummer 32 MW
Generators1in service
Net generation-4GWh12 mo to Aug 2026
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2015
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2016 | -5.2 | — | — |
| 2017 | -5.8 | — | — |
| 2018 | -3.5 | — | — |
| 2019 | -1.6 | — | — |
| 2020 | -12.3 | — | — |
| 2021 | -12.3 | — | — |
| 2022 | -8.2 | — | — |
| 2023 | -8.4 | — | — |
| 2024 | -3.6 | — | — |
| 2025 | -3.8 | — | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| BRES | Batteries | BA | 31.5 | 31.5 | Oct 2015 | Operating | — | coming soon |
Owner / operator
Operator: Invenergy Services LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Invenergy Services LLC | 100.0% | 32 MW |
Nearby plants
Within 80 km.
| Beech Ridge Energy LLC | 101 MW | 0 km |
| Beech Ridge II Wind Energy Center | 56 MW | 10.9 km |
| Gauley River Power Partners | 80 MW | 37.8 km |
| Covington Facility | 161 MW | 54.1 km |
| Hawks Nest Hydro | 102 MW | 60.1 km |
| Bath County | 2,862 MW | 62 km |