Gastonia Solar Center

Gaston County, North Carolina · EIA plant ID 60359 · Operator: Enerparc Inc.
SolarSolar PhotovoltaicBA: DUK
Nameplate4MWSummer 4 MW
Generators1in service
Net generation8GWh12 mo to Dec 2025
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2018

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh2019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20182019202020212022202320242025202621.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20180.25.4%—
20194.411.7%—
20205.915.7%—
20218.322.0%—
20227.519.8%—
20238.121.6%—
20247.921.0%—
20258.121.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
60916Solar PhotovoltaicPV4.34.3Dec 2018Operating—coming soon

Owner / operator

Operator: Enerparc Inc.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Enerparc Inc.100.0%4 MW

Nearby plants

Within 80 km.
Gastonia, Tulip Drive5 MW6.8 km
Gaston Memorial Hospital2 MW6.9 km
Gastonia Prime Power Park12 MW8.3 km
Auten Road Farm, LLC5 MW9.7 km
Long Creek Waste Water Plant5 MW10.2 km
Gaston Solar Power Plant25 MW11.5 km