← Back to map

Boulder Solar Power, LLC

Clark County, Nevada · EIA plant ID 60352 · Operator: Southern Power Co
SolarSolar PhotovoltaicBA: NEVP
Nameplate100MWSummer 100 MW
Generators1in service
Net generation273GWh12 mo to Aug 2026
Capacity factor31%solar units, summer MW
Heat rate—thermal plants only
First online2016

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0102030GWh2017201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20162018202020222024202631.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201610.714.4%—
2017271.531.0%—
2018280.132.0%—
2019268.130.6%—
2020281.232.0%—
2021260.529.7%—
2022267.730.6%—
2023261.229.8%—
2024270.630.8%—
2025275.131.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BSPSolar PhotovoltaicPV100100Dec 2016Operating—coming soon

Owner / operator

Operator: Southern Power Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Boulder Solar Power, LLC100.0%100 MW

Nearby plants

Within 80 km.
Searchlight Solar18 MW15 km
Arida Solar (Hybrid)—38.2 km
Davis Dam255 MW39.9 km
Silver State Solar Power South260 MW44.6 km
Higgins Generating Station688 MW45.8 km
Silver State South Storage200 MW46.4 km