Keys Energy Center

Prince Georges County, Maryland · EIA plant ID 60302 · Operator: PSEG Keys Energy Center, LLC
Natural gasNatural Gas Fired Combined CyclePJMBA: PJM
Nameplate831MWSummer 766 MW
Generators3in service
Net generation4,451GWh12 mo to Aug 2026
Capacity factor66%gas/coal/oil units, summer MW
Heat rate7,231Btu/kWhfossil units, electric fuel, HHV
First online2018Runs as baseload

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400GWh20192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2018202020222024202666.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,8007,0007,2007,400201820202022202420267,231 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20182,189.665.7%7,161
20194,658.570.4%7,034
20204,949.174.0%7,124
20214,934.474.0%7,125
20224,581.966.5%7,078
20234,202.762.9%7,388
20244,916.173.4%7,142
20254,370.665.1%7,198

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
10Natural Gas Fired Combined CycleCA359.6766.1Jul 2018Operating—coming soon
11Natural Gas Fired Combined CycleCT235.5—Jul 2018Operating—coming soon
12Natural Gas Fired Combined CycleCT235.5—Jul 2018Operating—coming soon

Owner / operator

Operator: PSEG Keys Energy Center, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
PSEG Keys Energy Center, LLC100.0%831 MW

Nearby plants

Within 80 km.
Bluefin Origination 12 MW4 km
Brandywine Power Facility289 MW4.6 km
Hall Property2 MW7.3 km
TPE MD PR2322 MW9.6 km
Upper Marlboro 1 CSG2 MW10.7 km
TPE MD PR2702 MW11.1 km