← Back to map

Holloman Solar Facility

Otero County, New Mexico · EIA plant ID 60301 · Operator: El Paso Electric Co
SolarSolar PhotovoltaicBA: EPE
Nameplate5MWSummer 5 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor10%solar units, summer MW
Heat rate—thermal plants only
First online2018

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.51GWh2019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2018201920202021202220232024202520269.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2018217.9%—
201912.328.0%—
20208.820.0%—
20219.120.7%—
20228.118.5%—
20236.514.9%—
20243.37.4%—
20254.39.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
HPV1Solar PhotovoltaicPV55Oct 2018Operating—coming soon

Owner / operator

Operator: El Paso Electric Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
El Paso Electric Co100.0%5 MW

Nearby plants

Within 80 km.
Alamogordo Solar Energy Center5 MW9.2 km
Otero Solar8 MW11.3 km
Pluma - Reynolds (CSG)5 MW15.7 km
WSMR I4 MW69.6 km
USS Jornada Solar—79 km
SLO-3 Community Solar5 MW79 km