Castor Solar

Kern County, California · EIA plant ID 60277 · Operator: ZGlobal Inc
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate2MWSummer 2 MW
Generators1in service
Net generation1GWh12 mo to Dec 2025
Capacity factor6%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300MWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2016201820202022202420265.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20161.514.7%—
20172.821.2%—
20182.620.1%—
20192.116.2%—
20203.123.3%—
20213.123.8%—
20222.922.4%—
20230.97.0%—
202400.0%—
20250.85.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CASTRSolar PhotovoltaicPV1.51.5Apr 2016Operating (Out of service, expected back within the year)—coming soon

Owner / operator

Operator: ZGlobal Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
GL Castor I, LLC100.0%2 MW

Nearby plants

Within 80 km.
Eagle Creek3 MW0.8 km
Elk Hills Power LLC623 MW10.8 km
Maricopa West Solar PV, LLC20 MW12.4 km
Taft 26C Cogen12 MW13.2 km
Chalk Cliff Limited46 MW13.3 km
Berry Cogen39 MW14.1 km