← Back to map

Conetoe Solar

Edgecombe County, North Carolina · EIA plant ID 60188 · Operator: Conetoe Solar, LLC
SolarSolar PhotovoltaicPJMBA: PJM
Nameplate5MWSummer 5 MW
Generators1in service
Net generation5GWh12 mo to Dec 2025
Capacity factor12%solar units, summer MW
Heat rate—thermal plants only
First online2015

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.51GWh2016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202611.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201500.0%—
201610.423.6%—
20179.922.7%—
201810.223.3%—
20191022.9%—
20209.220.9%—
20218.619.5%—
20228.619.6%—
20238.719.9%—
20247.817.8%—
20255.111.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CON15Solar PhotovoltaicPV55Dec 2015Operating—coming soon

Owner / operator

Operator: Conetoe Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Conetoe Solar, LLC100.0%5 MW

Nearby plants

Within 80 km.
Conetoe II Solar, LLC80 MW2.1 km
Tarboro Solar5 MW5.2 km
Bethel Solar5 MW7.1 km
Bethel Price Solar, LLC5 MW7.7 km
Penny Hill Solar2 MW8.9 km
Everett PV110 MW13.4 km