Cornell Geneva Solar Farm

Ontario County, New York · EIA plant ID 60150 · Operator: Novis Renewables, LLC
SolarSolar PhotovoltaicNYISOBA: NYIS
Nameplate2MWSummer 2 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor14%solar units, summer MW
Heat rate—thermal plants only
First online2015

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh2016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202613.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201500.1%—
20162.916.8%—
20173.218.2%—
20183.117.5%—
20193.117.6%—
20203.117.7%—
2021317.2%—
20223.117.6%—
2023316.9%—
20243.218.1%—
20252.413.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ARGOSSolar PhotovoltaicPV22Dec 2015Operating—coming soon

Owner / operator

Operator: Novis Renewables, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Novis Renewables, LLC100.0%2 MW

Nearby plants

Within 80 km.
Geneva CSG 1 LLC5 MW1.1 km
Geneva CSG 2 LLC5 MW1.1 km
Hobart & William Smith College Gates Rd.2 MW1.6 km
Strauss CSG2 MW4.1 km
Ontario LFGTE11 MW4.7 km
Zotos International WPGF3 MW5.6 km