Baltimore Church Solar, LLC

Robeson County, North Carolina · EIA plant ID 60144 · Operator: Altus Power America Management, LLC
SolarSolar PhotovoltaicBA: DUK
Nameplate5MWSummer 5 MW
Generators1in service
Net generation7GWh12 mo to Dec 2025
Capacity factor15%solar units, summer MW
Heat rate—thermal plants only
First online2017

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh20182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%20182019202020212022202320242025202615.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20187.816.6%—
20197.916.7%—
20207.415.7%—
20217.616.1%—
20227.515.8%—
20235.411.5%—
20245.912.5%—
20257.215.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
FLS1Solar PhotovoltaicPV5.45.4Oct 2017Operating—coming soon

Owner / operator

Operator: Altus Power America Management, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Altus Power America Management, LLC100.0%5 MW

Nearby plants

Within 80 km.
Floyd Solar, LLC7 MW5 km
Progress Solar II, LLC4 MW5.1 km
Fairmont-FLS 1004 MW6.3 km
Panda Solar NC 1, LLC1 MW6.6 km
Panda Solar NC 2, LLC2 MW7 km
Turkey Branch Solar LLC5 MW7.8 km