Javelina Wind Energy, LLC

Webb County, Texas · EIA plant ID 60104 · Operator: Javelina Wind Energy, LLC
WindOnshore Wind TurbineERCOTBA: ERCO
Nameplate250MWSummer 250 MW
Generators1in service
Net generation709GWh12 mo to Aug 2026
Capacity factor32%wind units, summer MW
Heat rate—thermal plants only
First online2015

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0255075100GWh20162017201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%20162018202020222024202632.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201556.430.4%—
201691241.6%—
2017946.443.3%—
2018962.544.0%—
2019966.644.2%—
202094643.1%—
2021927.342.4%—
2022906.841.5%—
2023867.939.7%—
2024839.538.3%—
2025925.342.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEWTGOnshore Wind TurbineWT249.7249.7Dec 2015Operating—ge 2.0-116

Owner / operator

Operator: Javelina Wind Energy, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Javelina Wind Energy, LLC100.0%250 MW

Nearby plants

Within 80 km.
Javelina Wind Energy II, LLC200 MW16 km
Sendero78 MW17.6 km
Whitetail92 MW18.7 km
Mars Solar10 MW19.8 km
Cedro Hill Wind LLC300 MW30 km
Torrecillas Energy Storage—36.8 km