← Back to map

US-TOPCO (Soccer Center)

Los Angeles County, California · EIA plant ID 60086 · Operator: SolarCity Corporation
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate3MWSummer 3 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor13%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.51GWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%20162018202020222024202613.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201600.0%—
20177.327.8%—
201810.941.5%—
20196.625.1%—
20205.420.6%—
20216.725.6%—
20227.528.4%—
2023726.5%—
2024726.4%—
20253.513.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV33Dec 2016Operating—coming soon

Owner / operator

Operator: SolarCity Corporation. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
SolarCity Corporation100.0%3 MW

Nearby plants

Within 80 km.
Morgan Lancaster 12 MW0.2 km
Green Beanworks D PV3 MW0.6 km
Solar Oasis LLC20 MW1.4 km
Vinam2 MW2 km
Arrache 80834 MW2.3 km
Arrache 40062 MW2.8 km