← Back to map

White Pine Solar, LLC

Taylor County, Georgia · EIA plant ID 60064 · Operator: White Pine Solar, LLC
SolarSolar PhotovoltaicBA: SOCO
Nameplate101MWSummer 101 MW
Generators1in service
Net generation188GWh12 mo to Dec 2025
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
05101520GWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202621.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201674.716.7%—
2017206.523.3%—
2018191.921.6%—
2019200.622.6%—
2020188.921.3%—
202119421.9%—
2022203.322.9%—
2023188.221.2%—
2024189.621.3%—
2025187.921.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WHTPNSolar PhotovoltaicPV101.2101.2Jul 2016Operating—coming soon

Owner / operator

Operator: White Pine Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
White Pine Solar, LLC100.0%101 MW

Nearby plants

Within 80 km.
Butler Solar Project 103104 MW6.5 km
Pawpaw Solar Plant31 MW7.4 km
Taylor County Solar148 MW9.4 km
Butler Solar Farm 2022 MW9.5 km
Taylor8 MW13.6 km
Flint River Operations77 MW33.2 km