Lindberg FIeld Solar

San Diego County, California · EIA plant ID 60060 · Operator: Lindberg Field Solar I LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate3MWSummer 3 MW
Generators3in service
Net generation3GWh12 mo to Dec 2025
Capacity factor15%solar units, summer MW
Heat rate—thermal plants only
First online2015

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600MWh20152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20162018202020222024202614.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20150.136.8%—
20165.424.1%—
20175.221.9%—
20183.313.8%—
20194.920.8%—
20205.322.3%—
2021417.0%—
2022521.1%—
20234.619.6%—
2024312.8%—
20253.514.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SDIA2Solar PhotovoltaicPV1.81.7Feb 2016Operating—coming soon
SDIAASolar PhotovoltaicPV0.60.5Sep 2015Operating—coming soon
SDIABSolar PhotovoltaicPV0.50.5Dec 2015Operating—coming soon

Owner / operator

Operator: Lindberg Field Solar I LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Lindberg Field Solar I LLC100.0%3 MW

Nearby plants

Within 80 km.
Lindberg Field Solar 22 MW0.2 km
San Diego International Airport BESS2 MW1.4 km
NRG Energy San Diegoretired4 km
University of San Diego1 MW5 km
Naval Hospital Medical Center5 MW5.7 km
Gas Utilization Facility6 MW6.7 km