Findlay Wind Farm

Hancock County, Ohio · EIA plant ID 60015 · Operator: Findlay Wind Farm
WindOnshore Wind TurbinePJMBA: PJM
Nameplate3MWSummer 3 MW
Generators1in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online2015

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh201620172018201920202021202220232024

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20162018202020222024

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201500.0%—
20167.127.0%—
20178.431.8%—
20187.528.4%—
20197.929.9%—
20207.729.1%—
20217.428.2%—
20228.331.7%—
20237.227.3%—
2024518.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WNDW1Onshore Wind TurbineWT33Dec 2015Operating—goldwind GW 87/1500

Owner / operator

Operator: Findlay Wind Farm. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Todd A.Stoller Living Trust95.0%3 MW
One Energy Capital LLC5.0%0 MW

Nearby plants

Within 80 km.
Zephyr Wind5 MW0.6 km
Zephyr Wind Project - 2.05 MW1.1 km
Valfilm Wind Project3 MW1.9 km
Border Basin Solar—6.1 km
Buckeye Power Inc.2 MW8.8 km
South Branch Solar—11.2 km