← Back to map

Henryville Solar RES

Clark County, Indiana · EIA plant ID 59986 · Operator: Hoosier Energy R E C, Inc
SolarSolar PhotovoltaicMISOBA: MISO
Nameplate1MWSummer 1 MW
Generators1in service
Net generation1GWh12 mo to Dec 2025
Capacity factor15%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
050100150200MWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%20162018202020222024202615.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20160.39.9%—
20171.818.7%—
20181.717.6%—
20191.818.9%—
20201.818.8%—
20211.718.1%—
20221.515.7%—
20231.717.8%—
20241.818.3%—
20251.515.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV1.11.1Sep 2016Operating—coming soon

Owner / operator

Operator: Hoosier Energy R E C, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Hoosier Energy R E C, Inc100.0%1 MW

Nearby plants

Within 80 km.
Scottsburg Solar Park7 MW7.4 km
Nabb Battery Energy Storage System5 MW12.7 km
Trimble County2,594 MW31.8 km
Ohio Falls110 MW34.7 km
Clifty Creek1,304 MW34.8 km
Zornretired35.7 km