Alpine Power Plant

Otsego County, Michigan · EIA plant ID 59926 · Operator: Wolverine Power Supply Coop
Natural gasNatural Gas Fired Combustion TurbineMISOBA: MISO
Nameplate454MWSummer 406 MW
Generators2in service
Net generation776GWh12 mo to Dec 2025
Capacity factor22%gas/coal/oil units, summer MW
Heat rate11,064Btu/kWhfossil units, electric fuel, HHV
First online2016Runs as peaking

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
050100150GWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202621.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
10,00010,50011,00011,50020162018202020222024202611,064 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2016319.916.5%10,548
2017460.413.0%11,179
2018642.318.1%11,456
20193128.8%11,193
2020805.822.6%10,631
2021855.224.1%11,140
2022924.326.0%11,139
2023816.423.0%11,366
2024498.514.0%11,302
2025775.521.8%11,064

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
AI1Natural Gas Fired Combustion TurbineGT226.9203.6Jun 2016Operating—coming soon
AI2Natural Gas Fired Combustion TurbineGT226.9202.2Jul 2016Operating—coming soon

Owner / operator

Operator: Wolverine Power Supply Coop. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Wolverine Power Supply Coop100.0%454 MW

Nearby plants

Within 80 km.
Livingston Generating Station170 MW8.3 km
Gaylord - Wolverine70 MW10.5 km
Kalkaska CT #161 MW51.2 km
Grayling Generating Station39 MW52.1 km
Kleber2 MW53.1 km
Tower21 MW53.2 km