← Back to map

Mount Olive Solar

Wayne County, North Carolina · EIA plant ID 59908 · Operator: AES Distributed Energy
SolarSolar PhotovoltaicBA: CPLE
Nameplate2MWSummer 2 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor18%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202617.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201600.0%—
2017423.1%—
20183.721.1%—
20193.922.0%—
20203.318.9%—
20213.419.3%—
20223.419.4%—
20232.212.7%—
20242.413.7%—
20253.117.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
2MWPVSolar PhotovoltaicPV22Dec 2016Operating—coming soon

Owner / operator

Operator: AES Distributed Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
AES Distributed Energy100.0%2 MW

Nearby plants

Within 80 km.
Mt Olive Solar 15 MW0.2 km
Solar Lee, LLC5 MW1.3 km
Belafonte3 MW2.2 km
Eros Solar, LLC5 MW2.3 km
Mount Olive Farm5 MW2.9 km
Harrell's Hill Solar Center LLC5 MW3.6 km