Fort Stewart Solar Facility
Liberty County, Georgia · EIA plant ID 59865 · Operator: Georgia Power Co
Nameplate30MWSummer 30 MW
Generators1in service
Net generation47GWh12 mo to Dec 2025
Capacity factor18%solar units, summer MW
Heat rate—thermal plants only
First online2016
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2016 | 12.1 | 18.3% | — |
| 2017 | 58.4 | 22.2% | — |
| 2018 | 52.7 | 20.1% | — |
| 2019 | 54.3 | 20.6% | — |
| 2020 | 50.5 | 19.2% | — |
| 2021 | 47.7 | 18.2% | — |
| 2022 | 53.2 | 20.3% | — |
| 2023 | 51.1 | 19.5% | — |
| 2024 | 35.2 | 13.4% | — |
| 2025 | 47.5 | 18.1% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Solar Photovoltaic | PV | 30 | 30 | Oct 2016 | Operating | — | coming soon |
Owner / operator
Operator: Georgia Power Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Georgia Power Co | 100.0% | 30 MW |
Nearby plants
Within 80 km.
| Crossroads Solar - GA | — | 22.5 km |
| Interstate Paper LLC Riceboro | retired | 25.4 km |
| Bryan Floyd | 2 MW | 27.6 km |
| Superior Landfill Gas Recovery | 6 MW | 33.5 km |
| Jesup Plant | 70 MW | 36 km |
| Boulevard | retired | 45.1 km |