Sumner County, Kansas · EIA plant ID 59837 · Operator: EDF Renewable Asset Holdings, Inc.
Nameplate150MWSummer 150 MW
Generators1in service
Net generation445GWh12 mo to Dec 2025
Capacity factor34%wind units, summer MW
Heat rate—thermal plants only
First online2015
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2015 | 38.6 | 34.5% | — |
| 2016 | 626.7 | 47.6% | — |
| 2017 | 614 | 46.7% | — |
| 2018 | 607.8 | 46.3% | — |
| 2019 | 573.9 | 43.7% | — |
| 2020 | 616.2 | 46.8% | — |
| 2021 | 614.7 | 46.8% | — |
| 2022 | 563 | 42.8% | — |
| 2023 | 512 | 39.0% | — |
| 2024 | 510.9 | 38.8% | — |
| 2025 | 444.7 | 33.8% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GEN1 | Onshore Wind Turbine | WT | 150 | 150 | Dec 2015 | Operating | — | vestas V100-2.0 |
Owner / operator
Operator: EDF Renewable Asset Holdings, Inc.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| EDF Renewable Asset Holdings, Inc. | 100.0% | 150 MW |
Nearby plants
Within 80 km.
| Kay Wind, LLC | 299 MW | 17.2 km |
| WPWP | 307 MW | 18.9 km |
| Oxford (KS) | 5 MW | 19.1 km |
| Wellington 2 | 20 MW | 19.7 km |
| Wellington 1 | 24 MW | 22.1 km |