← Back to map

Sunnyside Ranch Community Solar Array

Garfield County, Colorado · EIA plant ID 59742 · Operator: Holy Cross Electric Assn Inc
SolarSolar PhotovoltaicBA: PSCO
Nameplate2MWSummer 2 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor12%solar units, summer MW
Heat rate—thermal plants only
First online2015

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400MWh2016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202612.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20152.222.3%—
20163.123.8%—
20173.324.9%—
20183.224.4%—
20192.922.1%—
20203.123.2%—
20212.922.3%—
20223.224.4%—
20232.720.2%—
20242.518.8%—
20251.612.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
HCESolar PhotovoltaicPV1.51.5Apr 2015Operating—coming soon

Owner / operator

Operator: Holy Cross Electric Assn Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Holy Cross Electric Assn Inc100.0%2 MW

Nearby plants

Within 80 km.
Ameresco HCE Solar LLC5 MW8.8 km
Shoshone (CO)14 MW18.3 km
Basalt5 MW29.4 km
Pitkin County Solar5 MW30.5 km
American Gypsum Cogeneration10 MW31.5 km
Eagle Valley Clean Energy LLC Biomassretired31.8 km