Innovative Solar 37 LLC
Anson County, North Carolina · EIA plant ID 59665 · Operator: Dominion Renewable Energy
Nameplate100MWSummer 98 MW
Generators1in service
Net generation147GWh12 mo to Aug 2026
Capacity factor17%solar units, summer MW
Heat rate—thermal plants only
First online2017
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2017 | 91.1 | 15.5% | — |
| 2018 | 154 | 17.6% | — |
| 2019 | 150.6 | 17.2% | — |
| 2020 | 138.2 | 16.1% | — |
| 2021 | 144.7 | 16.9% | — |
| 2022 | 151.9 | 17.8% | — |
| 2023 | 143.8 | 16.8% | — |
| 2024 | 113.7 | 13.3% | — |
| 2025 | 137.5 | 16.1% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| IS037 | Solar Photovoltaic | PV | 100 | 97.5 | May 2017 | Operating | — | coming soon |
Owner / operator
Operator: Dominion Renewable Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Dominion Renewable Energy | 100.0% | 100 MW |
Nearby plants
Within 80 km.
| Pecan PV1 | 5 MW | 13.1 km |
| Mills Anson Farm | 5 MW | 14.4 km |
| Anson County Generation Facility | 344 MW | 14.6 km |
| Selwyn Farm | 5 MW | 15.8 km |
| Wadesboro Solar | 5 MW | 17 km |
| Blewett | 95 MW | 17.2 km |