L&D Landfill SolarRetirement planned
Burlington County, New Jersey · EIA plant ID 59601 · Operator: Public Service Elec & Gas Co
Nameplate10MWSummer 10 MW
Generators1in service
Net generation15GWh12 mo to Dec 2025
Capacity factor17%solar units, summer MW
Heat rate—thermal plants only
First online2015Retirement planned Dec 2035
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2015 | 0 | 0.0% | — |
| 2016 | 16.7 | 19.0% | — |
| 2017 | 16.6 | 18.9% | — |
| 2018 | 15.8 | 18.0% | — |
| 2019 | 16.7 | 19.1% | — |
| 2020 | 16.2 | 18.5% | — |
| 2021 | 16.9 | 19.3% | — |
| 2022 | 16.7 | 19.1% | — |
| 2023 | 14.4 | 16.5% | — |
| 2024 | 16.8 | 19.2% | — |
| 2025 | 15 | 17.2% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| L&D | Solar Photovoltaic | PV | 10 | 10 | Dec 2015 | Operating · retirement planned | Dec 2035 | coming soon |
Owner / operator
Operator: Public Service Elec & Gas Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Public Service Elec & Gas Co | 100.0% | 10 MW |
Nearby plants
Within 80 km.
| Summit Water Nexus Mt. Holly, LLC Solar | 1 MW | 2.8 km |
| Alethea I | 3 MW | 3.8 km |
| West Pemberton | 7 MW | 4.5 km |
| Pemberton Road II | 9 MW | 5.8 km |
| Pemberton Road I | 9 MW | 6.2 km |
| Bordentown Solar | 7 MW | 6.5 km |