← Back to map

Springer Solar 1

Colfax County, New Mexico · EIA plant ID 59560 · Operator: Springer Electric Coop, Inc
SolarSolar PhotovoltaicBA: PNM
Nameplate1MWSummer 1 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor28%solar units, summer MW
Heat rate—thermal plants only
First online2015

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300MWh2016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20162018202020222024202627.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20151.735.5%—
20162.636.7%—
20172.535.6%—
20182.532.2%—
20192.531.1%—
20202.531.6%—
20212.430.9%—
20222.329.1%—
20232.228.0%—
2024225.7%—
20252.227.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SPRG1Solar PhotovoltaicPV10.9May 2015Operating—coming soon

Owner / operator

Operator: Springer Electric Coop, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Springer Electric Coop, Inc100.0%1 MW

Nearby plants

Within 80 km.
Cimarron Solar Facility31 MW8.6 km
Angel Fire Energy Facility11 MW61.5 km
Syncarpha Eagle Nest1 MW63.2 km